Pace Engineering fabricated and erected more than 670 tonnes of Steltech and general steel sections for a 14000 square meter warehouse and office facility at Roscommon Road, Wiri.
The project took 12 months to complete and required interaction between steel suppliers, industrial coatings specialists, transport operators, independent inspection services, and other site sub-trades.
Pace provided:
- Pro-Steel CAD drawings in both GA and structural detail
- Design support to assist with variation changes
- Effective advice and mechanical support to other trades
- Leadership and flexibility during the construction period
- Highly competent change management skills
- Material data report and quality assurance package